Road Construction and Lane Closures 3-8-13-2024

0
256

MIDDLE TENNESSEE SCHEDULED LANE CLOSURES

March 7-13, 2024

To subscribe to the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected] and type subscribe TDOT-REGION-3-LANE-CLOSURES in the message body. 

To unsubscribe from the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected] and type unsubscribe TDOT-REGION-3-LANE-CLOSURES in the message body.

DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40

The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in Dickson County to near U.S. 70S (Exit 196) in Davidson County

  • Daily 7:30 a.m. – 6 p.m.  There will be temporary daytime shoulder closures in both directions for conduit installation at various locations throughout the project limits. (MM 174-196)
  • Nightly, 8:00 p.m. – 5 a.m.  There will be temporary nighttime shoulder closures in both directions for conduit installation at various locations throughout the project limits. (MM 174-196)

 

DAVIDSON COUNTY I-40

The repair of the bridges on I-65 over Arthur Avenue (L.M. 8.80) and the repair of the bridge on I-40 over I-40, I-65 and the I-65 ramp (L.M. 16.14).

  • Nightly, 8pm – 5am: Alternating lane closures on I-40 EB (Exit 208 B to I-65 N), and I-40 WB (Exit 208) for parapet and overhang demo on I65 interchange.

The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange

  • Daily (excluding weekend), 1 p.m., There will be an alternating rolling roadblock on I-40 in both directions for blasting.
  • LOOK AHEAD: 3/15 – 3/18, 8p.m. – 5a.m., There will be lane closure on I40 EB closure to install barrier rails for the traffic swap. Ramp 216C will be permanent close and all the traffic to Donelson will use the temp ramp on 216B.

 

HICKMAN COUNTY I-40

The repair of the bridges on I-40 over Sugar Creek and Resurfacing on I-40

  • Nightly, 7 p.m. – 5 a.m., There will be a temporary lane closures on I-40 EB and WB for bridge repair work.  One lane will remain open at all times.

 

DAVIDSON COUNTY I-65

The repair of the bridges on I-65 over Arthur Avenue (L.M. 8.80) and the repair of the bridge on I-40 over I-40, I-65 and the I-65 ramp (L.M. 16.14).

  • Nightly, 8pm – 5am: Alternating lane closures on I-65 NB and SB for installation of beam strength plates and expansion joint repairs and parapet/overhang demo on I40 interchange.

 

ROBERTSON COUNTY I-65

Interstate Widening – Grading, drainage, construction of bridges and retaining walls, ITS and paving 

  • 2/21, 10a.m. – 3 p.m.: There will be a controlled burn on the southbound outside shoulder between MM 119 to Exit 117. No lane closure is needed.. (MM 112 – 120)

 

WILLIAMSON COUNTY I-65

I-65 Interchange at Buckner Road

  • Nightly, excluding Saturday, 8 p.m. – 5 a.m., There will be a lane closure on I-65 NB and SB from LM 55.4 to LM 56.0 for moving barrier rail and bridge texture coating.

 

DAVIDSON COUNTY SR 1

The construction of pedestrian facilities on U.S. 41 (U.S. 70, SR 1, Murfreesboro Road) from Division Street (L.M. 18.35) to Menzler Road (L.M. 20.43) in Nashville.

  • Daily, 9 a.m. – 3 p.m., There will be right lane closures, in both directions, on Lafayette Street from 4th Street to Fesslers Avenue for relocating utilities.

 

DAVIDSON COUNTY SR 11

The widening of US 31A (SR 11, Nolensville Pike) from North of the Millcreek bridge (LM 1.72) to SR 254 (OHB) (LM 4.24), including bridges, retaining walls, signals and lighting.

  • Daily, 9 a.m. – 3 p.m. There will be temporary lane closures on SR 11 and associated side roads for placement of barrier rail, blasting for grade work and clearing operations..

The random on-call sign replacement on various interstates and state routes.

  • Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for sign replacements.

 

DAVIDSON COUNTY SR 24 

The resurfacing on SR 24 (Lebanon Road) from near Stones River Road (LM 21.90) to Highland View Drive (LM 23.83).

  • Daily & Nightly, 9 a.m. – 3 p.m. and 8 p.m. – 5 a.m., There will be intermittent, alternating lane and ramp closures on SR 24(US 70), (Lebanon Rd), for utility adjustments and milling.

 

DAVIDSON COUNTY SR 106

The random on-call sign replacement on various interstates and state routes.

  • Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for sign replacements.

 

DAVIDSON COUNTY SR 112

SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.)

  • Daily,  9 a.m. – 3 p.m. There will be temporary alternating lane closures on SR 112 Clarksville Pike in both directions for grade work, paving, water line work, storm drain installation and communications.  The merging lane to Nashville on Ashland City Highway will be closed.

 

DAVIDSON COUNTY SR 255

The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the Donelson Pike interchange

  • Daily, 9a.m. – 3 p.m., There will be a lane closure on Donelson Pk for grade work and storm drain installation.

 

LINCOLN COUNTY SR 10

The repair of bridges on SR10 over Elk River (L.M. 10.57)

  • Daily 9a.m. – 3 p.m., There will be temporary lane closures on SR 10 (US431) and Thornton Taylor Bypass in both directions for bridge and sidewalk repair.  

 

MONTGOMERY COUNTY SR 112 / SR 76

Intersection Improvements. Grading, Drainage and Construction of Retaining walls.

  • Daily, 9 a.m. – 3 p.m. Temporary lane closures for utility relocation, grading and drainage installation.

 

MONTGOMERY COUNTY SR 48

The repair of the bridges on S.R. 48 over Bartons Creek (L.M. 0.40) and Louise Creek (L.M. 3.36).

  • Continuous The bridges will be reduced to one lane in order to demo the old bridge and reconstruct. Traffic will be controlled by temporary signals at each bridge.

 

MONTGOMERY COUNTY SR 149

The repair of the bridge on S.R. 149 over Yellow Creek (L.M. 1.53).

  • Continuous, The bridge will be reduced to one lane in order to demo and reconstruct the old bridge deck. Traffic will be controlled by temporary signals.

 

RUTHERFORD COUNTY SR 99

The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)

  • Daily, 9 AM-3 PM: There will be periodic flagging operations for construction activities.

 

RUTHERFORD COUNTY SR 266

The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).

  • Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
  • continuously, Old Jefferson Pike will be closed with its intersection with SR-266 for utility installation. A signed detour will be in place.

 

WILLIAMSON COUNTY SR 96

Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR 252 (Wilson Pk) (LM 20.62).

  • Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for traffic control and grading operations.

 

WILLIAMSON COUNTY SR 106

I-65 Interchange at Buckner Road

  • Daily 9 a.m. – 3 p.m., There will be intermittent flagging operation on Lewisburg Pike (SR 106) from LM 3.7 to LM 4.0 for construction activities.

 

WILSON COUNTY SR 24

Sidewalk Improvements along SR24 Phase II (Local Program)

  • Daily, 9AM – 3PM, There will be lane closures from SR171 to Park Glenn Dr for construction activities.

 

WILSON COUNTY SR 109

The grading, drainage, and signals on SR 109 at the I-40 ramps.

  • Nightly, 8 p.m. – 5 a.m., There will be lane closures on SR 109 NB and SB at the I-40 bridge for milling and paving activities at the I-40 interchange. This will include closures at I-40 EB onto SR 109 NB ramp and the on and off ramps for I-40 WB.

 

SCHEDULED MAINTENANCE WORK

 

DAVIDSON COUNTY I-24

Pothole Repair- Mill/Fill as needed

  • Nightly, 8 p.m. – 7 a.m., WB lanes 2 & 3 and shoulder will be closed for pothole repairs (MM 34-35)
  • Nightly, 8 p.m. – 7 a.m., WB lane 2 and shoulder will be closed for pothole repairs (MM 39-40)

 

WILLIAMSON COUNTY I-840

Pothole Repair- Mill/Fill as needed

  • Nightly, 8 p.m. – 7 a.m., WB lanes 2 & 3 and shoulder will be closed for pothole repairs (MM 28-30)
  • Nightly, 8 p.m. – 7 a.m., WB lane 2 and shoulder will be closed for pothole repairs (mm 31)

LEAVE A REPLY

Please enter your comment!
Please enter your name here